Boeing Co said on Sunday it will have to do more work on about 50 undelivered 737 Max airplanes, potentially delaying near-term deliveries, after its supplier Spirit AeroSystems discovered two mis-drilled holes on some fuselages.

Boeing confirmed the findings in response to a Reuters query after industry sources said a spacing problem had been discovered in holes drilled on a window frame, but the jetmaker said safety was unaffected and existing 737s could keep flying.

  • derf82@lemmy.world
    link
    fedilink
    English
    arrow-up
    7
    ·
    9 months ago

    It will hurt, but boing needs to announce a clean sheet narrowbody and end the 737Max. Put engineering 100% in charge of the development. Don’t give in to the sunk cost fallacy.

    Trying to slap even wider and higher bypass engines and maintain a common type rating was a cost saving measure that has blown up in their face.