    The NRC approved the design, so now they can start building it. That is still a looong way off from having a working reactor. And all those companies are way behind their originally planned schedules. Which is my whole point. I’m not saying they might not get this stuff to work some day. I’m saying that it will take way too long to make any contribution to fighting climate change. We need to decarbonise now and and we have the technology to do it now.

    • Earthwormjim91@lemmy.world
      link
      fedilink
      English
      arrow-up
      3
      ·
      1 year ago

      That’s got nothing to do with Microsoft though. Their reactor wouldn’t be used to power other people, only their own data centers.

      They currently buy that from the grid, and they don’t really have any control over the source of that electricity generation. We should absolutely be pushing the power generators to go with renewables, but Microsoft isn’t a generator. They’re a customer like you or me.

      They’re looking at moving to small reactors eventually because of the cost of buying from the grid, not for the environment.

      • Diplomjodler@feddit.de
        link
        fedilink
        English
        arrow-up
        2
        arrow-down
        3
        ·
        1 year ago

        It would still be far cheaper to deploy the same kind of capacity in renewables. Whoever came up with this brilliant plan can’t do basic math.

        • Earthwormjim91@lemmy.world
          link
          fedilink
          English
          arrow-up
          2
          ·
          1 year ago

          Probably not because they would need to buy MUCH more land to do it.

          SMRs are so much more compact per MW. The one from NuScale that is approved already can do 924MW in 0.05 square miles. To do the same capacity with wind would take 94 square miles and 17 square miles for solar.

          Buying 17 square miles of land close enough to just one of their data centers would cost billions, on top of the cost of paying for the panels and installation.

          The whole point of them looking at these at all is because they do not want to purchase from the grid.